Kinsale Main Drainage
Kinsale Main Drainage
Client: Malachy Walsh & Partners
General Description
This project involved 15km of precast concrete, ductile iron and HDPE foul, surface and water mains, 5m deep and ranging in diameter from 225mm to 800mm. The project also included the construction of a large R.C. Pump Station 9m deep confined on 3 sides by delicate buildings and a public road on the 4th side. The works were carried out in tidal areas of a busy tourist town with poor infrastructure and narrow streets
Features
- 15km precast concrete, ductile iron & HDPE Pipework, ranging from 225mm to 800mm diameter
- Foul sewers
- Surface water sewers
- Water mains
- Large RC Pump Station, 9M deep
- Town centre location
- Working around existing services