Project
Waterville Water Treatment Plant
Waterville Water Treatment Plant
Client: T J O’Connor and Associates. Dublin
General Description
This project involved the design and construction of a 3,300 m3 RC two cell reservoir, a 300m2 Dissolved Air Flotation control building including SCADA control etc. A RC blend tank and a backwash lagoon from the Dissolved Air Flotation building. 650m of 200mm rising main from Lough Currane. A 350 m3 reservoir in Spunkane including ancillary pipework.
Features
- Civil construction
- Design and Build M&E construction
- Construct 3,300 m3 RC Reservoir.
- Construct 300 m2 steel framed Dissolved Air Flotation and Control Building.
- Construct 350 m3 precast blend tank.
- Construct a backwash lagoon from the Dissolved Air Flotation building.
- Construct 350 m3 precast reservoir and ancillary pipework and roads etc.
- Excavate and lay 650m of 300mm Class C PVC rising main from Lough Currane.
- Marine Works – Lay 160m of 300mm HDPE inlet pipe from Lough Currane.
- Access Roads, landscaping & Fencing
- Works in environmentally sensitive location