Ballincollig WWTP
Ballincollig Wastewater Treatment Plant
General Description
This project involved the design and construction of a new 1050mm Inlet Pipe, a new 40,000 PE Inlet Works, Control Room and a 5,000 m3 Storm Tank, Construct a new outfall comprising 390m of 1050mm pressure pipe, Construct a Aeration Distribution System utilising the existing Aeration Carousel.
Features
- Demolish existing inlet pipework, Percolation Filters, Humus Tanks & Sludge Pumping Station.
- Construct new inlet pipework – 80mof 1050mm pipe.
- Construct new inlet works building consisting of the following:-
- Inlet screens.
- Grit removal.
- Grease removal.
- Scada
- Construct new 5,000 m3 Storm Tank.
- Construct a new outfall comprising 390m of 1050mm pressure pipe.
- Renovate existing Pumping Station and construct new 1000m3 balance tank.
- Construction of new Aeration Distribution System utilising the existing Aeration Carousel.